Open MercatoDocsSearch docsAPI reference

Tutorials

Material Availability Check

Check whether enough material is available before work can continue. The example turns that business decision into a rule you can create, evaluate and inspect.

Learn how to create a GUARD rule that prevents work orders from being released to production when required materials are not available in inventory. This tutorial demonstrates condition building, action configuration, and testing.

Scenario

Problem: Work orders are sometimes released to the shop floor before all required materials are available, causing production delays and resource waste.

Solution: Create a business rule that checks material availability and blocks the status change if materials are not ready.

Rule Behavior:

Prerequisites

Step 1: Navigate to Rules Page

  1. Open the Open Mercato admin interface
  2. Navigate to Business Rules > Rules in the main menu
  3. Click the Create Rule button in the top-right corner

The rule creation form will open.

Step 2: Fill Basic Information

Configure the rule's core properties.

Rule ID:

BLOCK_WO_RELEASE_WITHOUT_MATERIALS

Rule Name:

Block Work Order Release Without Materials

Description:

Prevents work orders from being released to production when required
materials are not available in inventory. This ensures production
schedulers have visibility into material constraints before committing
resources to the work order.

Rule Type: Select GUARD

πŸ’‘ GUARD rules are designed to block or allow operations. They're perfect for this use case.

Rule Category:

Material Planning

Entity Type:

WorkOrder

Event Type:

onStatusChange

ℹ️ The onStatusChange event triggers when the work order status field changes. This is more specific than beforeUpdate which fires on any field change.

Step 3: Set Metadata

Configure execution settings.

Priority: 800

πŸ’‘ High priority (500-1000) ensures this guard rule executes before other validation or action rules.

Enabled: βœ… Checked

Version: 1

Effective From: Leave empty (active immediately)

Effective To: Leave empty (no expiration)

Step 4: Build Conditions

Define when the rule should block the operation.

Understanding the Logic

We want to block when:

  1. The new status is "RELEASED" (user is trying to release the work order)
  2. Materials are NOT available

Click Add First Condition to begin.

Condition 1: Check New Status

Field: newStatus

Operator: = (equals)

Value: "RELEASED"

ℹ️ The newStatus field represents the status the user is trying to change to. This field is provided by the onStatusChange event.

Condition 2: Check Material Availability

Click Add Condition to add a second condition to the AND group.

Field: materialsAvailable

Operator: = (equals)

Value: false

ℹ️ This assumes your work order entity has a materialsAvailable boolean field. Adjust the field path based on your data model. You might use materials.available, materialStatus, or a calculated field.

Alternative: Check Material Quantity

If you don't have a boolean flag, you can check quantities:

AND Group:
  - newStatus = "RELEASED"
  - requiredQuantity > availableQuantity

Or check for zero inventory:

AND Group:
  - newStatus = "RELEASED"
  - availableQuantity <= 0

Final Condition Structure

Your condition builder should show:

AND Group (2 rules):
  - newStatus = "RELEASED"
  - materialsAvailable = false

This reads as: "Block when new status is RELEASED and materials are not available."

Step 5: Configure Actions

Set up what happens when conditions match.

Understanding Success vs. Failure Actions

For GUARD rules:

This might seem counterintuitive at first! Think of it as:

Add Failure Actions

These execute when we want to block the release.

Navigate to the Failure Actions section and click Add Action.

Action 1: Block the Transition

Type: Select BLOCK_TRANSITION

Configuration: No configuration needed

πŸ’‘ This action prevents the status change from occurring.

Action 2: Show Error Message

Click Add Action again.

Type: Select SHOW_ERROR

Message:

Cannot release work order. Required materials are not available in inventory. Please verify material availability and try again.

πŸ’‘ Clear, actionable error messages help users understand what went wrong and how to fix it.

Action 3: Notify Material Planner

Click Add Action again.

Type: Select NOTIFY

Recipients:

[email protected], [email protected]

ℹ️ Replace with actual email addresses or user IDs from your system.

Message:

Work order {{workOrderId}} cannot be released due to material unavailability. Status: {{status}}, Required materials: {{requiredMaterials}}

πŸ’‘ Use {{field}} syntax to include dynamic data in notification messages.

Action 4: Log the Block

Click Add Action once more.

Type: Select LOG

Level: Select warn

Message:

Blocked work order {{workOrderId}} release due to material unavailability. Requested by {{user.email}}

Success Actions

Leave the Success Actions section empty.

When materials ARE available (conditions are false), the rule succeeds and allows the operation without taking any action.

Step 6: Save the Rule

  1. Review all sections to ensure configuration is correct
  2. Click Create Rule at the bottom of the form
  3. You'll be redirected to the rule detail page

The rule is now active and will begin evaluating work order status changes immediately.

Step 7: Test the Rule

Test the rule to ensure it works as expected.

Test Case 1: Materials NOT Available (Should Block)

Using the API:

curl -X POST "$BASE_URL/api/business_rules/execute" \
  -H "Authorization: Bearer $API_KEY" \
  -H "Content-Type: application/json" \
  -d '{
    "entityType": "WorkOrder",
    "entityId": "wo-test-001",
    "eventType": "onStatusChange",
    "data": {
      "workOrderId": "wo-test-001",
      "oldStatus": "PENDING",
      "newStatus": "RELEASED",
      "materialsAvailable": false,
      "requiredMaterials": "Steel plates, bolts"
    },
    "dryRun": true
  }'

Expected Response:

{
  "allowed": false,
  "executedRules": [
    {
      "ruleId": "BLOCK_WO_RELEASE_WITHOUT_MATERIALS",
      "result": "FAILURE",
      "conditionResult": true,
      "message": "Cannot release work order. Required materials are not available..."
    }
  ]
}

Success: The rule blocked the operation as expected.

Test Case 2: Materials Available (Should Allow)

curl -X POST "$BASE_URL/api/business_rules/execute" \
  -H "Authorization: Bearer $API_KEY" \
  -H "Content-Type: application/json" \
  -d '{
    "entityType": "WorkOrder",
    "entityId": "wo-test-002",
    "eventType": "onStatusChange",
    "data": {
      "workOrderId": "wo-test-002",
      "oldStatus": "PENDING",
      "newStatus": "RELEASED",
      "materialsAvailable": true
    },
    "dryRun": true
  }'

Expected Response:

{
  "allowed": true,
  "executedRules": [
    {
      "ruleId": "BLOCK_WO_RELEASE_WITHOUT_MATERIALS",
      "result": "SUCCESS",
      "conditionResult": false
    }
  ]
}

Success: The rule allowed the operation when materials are available.

Test Case 3: Different Status Change (Should Ignore)

curl -X POST "$BASE_URL/api/business_rules/execute" \
  -H "Authorization: Bearer $API_KEY" \
  -H "Content-Type": application/json" \
  -d '{
    "entityType": "WorkOrder",
    "entityId": "wo-test-003",
    "eventType": "onStatusChange",
    "data": {
      "workOrderId": "wo-test-003",
      "oldStatus": "PENDING",
      "newStatus": "IN_PROGRESS",
      "materialsAvailable": false
    },
    "dryRun": true
  }'

Expected Response:

{
  "allowed": true,
  "executedRules": [
    {
      "ruleId": "BLOCK_WO_RELEASE_WITHOUT_MATERIALS",
      "result": "SUCCESS",
      "conditionResult": false
    }
  ]
}

Success: The rule didn't block because the status is not "RELEASED".

Step 8: Monitor Execution Logs

After testing, check the execution logs:

  1. Navigate to Business Rules > Execution Logs
  2. Filter by ruleId: BLOCK_WO_RELEASE_WITHOUT_MATERIALS
  3. Review the log entries

You should see three log entries from your tests showing:

Variations and Extensions

Variation 1: Check Specific Material Items

Instead of a boolean flag, check individual material items:

AND Group:
  - newStatus = "RELEASED"
  OR Group:
    - materials[0].quantity < materials[0].required
    - materials[1].quantity < materials[1].required

Variation 2: Allow Partial Release with Warning

Use SHOW_WARNING instead of BLOCK_TRANSITION:

Failure Actions:
  - SHOW_WARNING: "Some materials are below minimum quantity"
  - LOG: warn, "Partial material availability for {{workOrderId}}"

Variation 3: Check Material Lead Time

Add condition for lead time:

AND Group:
  - newStatus = "RELEASED"
  OR Group:
    - materialsAvailable = false
    - materialLeadTime > daysUntilRequired

Variation 4: Set Approval Flag

Set a flag requiring manager approval when materials are short:

Failure Actions:
  - SET_FIELD: approvalRequired = true
  - SET_FIELD: approvalReason = "Material shortage"
  - NOTIFY: [email protected], "Approval needed for {{workOrderId}}"
  - ALLOW_TRANSITION  (allow but flag for review)

Troubleshooting

Rule Not Executing

Check:

Rule Allowing When It Should Block

Check:

Error Messages Not Showing

Check:

Notifications Not Sending

Check:

Next Steps

Now that you've built your first GUARD rule:

  1. Creating Rules - Step-by-step rule builder walkthrough
  2. Conditions Guide - Deep dive into condition logic
  3. Rule Sets - Organize related rules
  4. Execution Logs - Monitor and troubleshoot runs

Summary

You've successfully created a GUARD rule that:

Prevents work order release when materials are unavailable βœ… Shows clear error messages to users βœ… Notifies the material planning team βœ… Logs all blocked attempts for audit trail βœ… Allows release when materials are ready

This rule helps prevent production delays by ensuring material availability before committing resources to work orders.